FacebookInstagramTwitterContact

 

4 Food Preservation Methods To Avoid Spoilage And 3 Alternatives To Refrigeration           >>           At Least A Dozen Water Suppliers In Iowa Are Still Providing Residents With Drinking Water Contaminated With “Forever Chemicals”           >>           Powdered Cheese: A Versatile, Shelf-Stable Food To Add To Your Survival Stockpile           >>           Emergency Water Pipe Repair Work Update           >>           Miscellaneous Offences Act 2021           >>           'Operasi Sepadu'           >>           'Badudun Bersama Biskita' Roadshow           >>           Hari Raya Aidilfitri Celebration           >>           International Merchandise Trade Statistics, February 2024           >>           Handover of Financial Aid           >>          

 

SHARE THIS ARTICLE




REACH US


GENERAL INQUIRY

[email protected]

 

ADVERTISING

[email protected]

 

PRESS RELEASE

[email protected]

 

HOTLINE

+673 222-0178 [Office Hour]

+673 223-6740 [Fax]

 



Upcoming Events





Prayer Times


The prayer times for Brunei-Muara and Temburong districts. For Tutong add 1 minute and for Belait add 3 minutes.


Imsak

: 05:01 AM

Subuh

: 05:11 AM

Syuruk

: 06:29 AM

Doha

: 06:51 AM

Zohor

: 12:32 PM

Asar

: 03:44 PM

Maghrib

: 06:32 PM

Isyak

: 07:42 PM

 



The Business Directory


 

 



Space & Science


  Home > Space & Science


NASA Delays Artemis 1 Moon Rocket Test To April 12th


NASA NASA / reuters

 


 April 11th, 2022  |  16:38 PM  |   286 views

WASHINGTON, UNITED STATES

 

The agency now plans to carry out a modified "wet dress rehearsal."

 

NASA has once again delayed the final test of its next-generation Space Launch System. The agency spent much of last weekend conducting a “wet dress rehearsal” of its upcoming Artemis 1 Moon mission. The test was designed to replicate the mission’s countdown procedure and was mostly moving along according to plan until NASA encountered a problem with the SLS’s mobile launcher platform.

 

The issue prevented the agency from safely loading the rocket with liquid propellant, and NASA delayed the critical test to troubleshoot the problem. It had initially planned to resume the test on April 9th to accommodate Axiom’s Space historic Ax-1 flight but announced today it was further delaying the trial to the start of next week. It also announced it would modify the test after engineers noticed a problem with a helium check valve designed to prevent the gas from escaping the SLS. The modified test will see NASA primarily focus on fueling the rocket's core stage, with “minimal propellant operations" of its upper stage.

 

“Due to the changes in loading procedures required for the modified test, wet dress rehearsal testing is slated to resume with call to stations on Tuesday, April 12th and tanking on Thursday, April 14th," NASA said.

 

Once the test is complete, NASA can finally move forward with Artemis 1. The mission will send an unmanned Orion capsule on a flight around the Moon designed to study how the trip will affect human astronauts. The agency won’t set a date for the mission until it completes the wet dress rehearsal. If it doesn’t encounter any further setbacks this week, Artemis 1 could lift off as early as this June.

 


 

Source:
courtesy of ENGADGET

by Igor Bonifacic

 

If you have any stories or news that you would like to share with the global online community, please feel free to share it with us by contacting us directly at [email protected]

 

Related News


Lahad Datu Murder: Remand Of 13 Students Extende

 2024-03-30 07:57:54

Cambodia Blast: 20 Soldiers Killed In Ammunition Explosion

 2024-04-28 00:52:46

Football Betting: Regulator To Meet Over 'Inaccurate' Stats Concern

 2024-04-28 00:24:48